CB Tank Assy
CB Tank Assy Large Cryogenic Common Bulkhead Propellant Tank
Large Cryo Tank Hardware
Large Cryo Tank Hardware In-work LH2 Tanks, with Completed LH2 (18-ft Dia) and LO2 (12-ft Dia) Tanks in Background.
Propellant Management Device (PMD)
Propellant Management Device (PMD)
Spacecraft Support Structure
Spacecraft Support Structure
Completed CB Tank
Completed CB Tank Completed Lap Welded Common Bulkhead Tank
Oxygen COPV in Test Configuration
Oxygen COPV in Test Configuration
Propellant Management Device (PMD)
Propellant Management Device (PMD)
LH2 Tank Assy
LH2 Tank Assy 18-ft Dia LH2 Tank Closeout Using Friction Stir Welding
FSW Tooling on the Move
FSW Tooling on the Move
LO2 Tank Assy
LO2 Tank Assy 12-ft Dia LO2 Tank Closeout using Friction Stir Welding
Support Equipment
Support Equipment
Composite/Metallic Assembly
Composite/Metallic Assembly
Composite Panel Complete
Composite Panel Complete
Integrated System Management
Integrated System Management
MAF Campus
MAF Campus
Titanium Liners for COPVs
Titanium Liners for COPVs High Performance Pressure Vessels in Work
Completed COPV
Completed COPV
Machine Shop
Machine Shop
Completed Tank Cylinder
Completed Tank Cylinder
Orthogrid Panel Buckling Test
Orthogrid Panel Buckling Test
Structural Test
Structural Test
Structural Test
Structural Test
COPVs
COPVs
Large Tank Proof Test Facility
Large Tank Proof Test Facility
Precision Tooling
Precision Tooling

GALLERY